First, the clear location
The design is compared with the actual situation, and the specific location of the appliance and keel is clarified. Determine the ceiling installation height, Yuba generally can play the maximum effect between 2.1m-2.3m.
Second, ensure the level
After the height is clear, do the horizontal installation angle. Use screws or glue (to prevent the tiles from being broken) to fix the corners. The corners of the corners should be neatly tiled without leaving any obvious gaps.
Third, punch positioning
After the position of the keel is determined, the hole is drilled with a hammer drill. Cut and assemble the boom screws according to the specific length. The boom screws are fastened in the borehole. This link can be carried out simultaneously with the previous step.
Fourth, install the keel
Install the main keel on the retaining ring under the boom screw, and the triangular keel is fixed on the main keel. After installation, adjust properly and gradually tighten the joint screws to ensure straightness.
Five, suspended ceiling
There are two installation methods for the square aluminum gusset ceiling: edge mounting, intermediate loading, depending on the specific situation. It is important to have the first board, which determines the position and level of the other boards.
Six, combination of electrical appliances
Assemble the appliance as required, and the mounting bracket should be secure. The integrated ceiling is best equipped with optional gussets and electrical appliances, which meets the requirements of size and load-bearing, and is not prone to accidents.
Seven, install electrical appliances
The installer should hold a professional electrical qualification certificate and the exposed wires should be protected. Connect the electrical appliances, buttons, and conduct the power test. After installation, use a leather hammer to make adjustments, leaving no gaps.
Eight, adjust the cap
The gussets at the corners are more difficult to install, so it is best to remove a complete gusset that is already installed next to the last gusset. Install it after adjusting to the best condition around.
Uvc Light,T5 Uvc Lamp,T5 Uvc Tube,T5 Uvc Bulb
Changxing leboom lighting product CO.Ltd. , https://www.leboomuvs.com