What is the key to summer decoration?

Season's impact on decoration is mainly reflected in temperature and humidity. In the past, people generally thought that decoration was better in the spring and autumn, and try to avoid the rainy summer with humid weather. However, with the development of science and technology, improvement of construction technology and technical equipment, the various effects of summer decoration can be controlled to a minimum, ensuring the quality of decoration. Therefore, decoration can be carried out in spring, summer and autumn. Let's take a look at our summer renovations for everyone.
Raiders 1. The climate is damp and moisture is the key

In the more humid and hot summer decoration, the key is moisture-proof. In summer, the air humidity is high, and some materials that easily absorb moisture, such as wood, boards, and gypsum board, are handled improperly in the transportation process and are prone to moisture. If the moisture-proof work is not handled well, in the air-dry season, wood deformation, cracking of the floor, cracks on the wall, impermeability of paint, and fogging will easily occur. To this end, everyone should pay attention to the following points during summer decoration:
Buy wood: It is best to go to large wholesalers, because the wood of large wholesalers has been dried. They directly pick up the goods from the container and reduce the intermediate links, thus reducing the chance of wood dampening. In the purchase of keel materials, it is best to choose products that have been processed for a period of time without open storage, so the moisture content of the keel is low; when buying solid wood flooring, it should pay attention to the moisture content can not exceed the standard, the Shanghai area should control the moisture content About 12-14%.
Paint construction: Due to the extremely wet weather, the wood products do not only dry slowly after being painted, but also the paint absorbs the moisture in the air and is also prone to fogging. In addition, latex paint is slow to dry, and it will appear moldy and smelly during hot weather.
Therefore, we should try to avoid brushing paint on rainy days. If it is not rainy, when we paint in an especially humid environment, we must use a desiccant or air conditioner to dehumidify the air.

Raiders II, high temperature climate anti-dry crack resistance

In addition to more rain and a humid climate, high temperatures also feature in summer. To this end, attention should be paid to the effects brought by high temperature, such as the problems of the tiles being not easily absorbed due to water absorption and the strength of the plaster being difficult to control.
To give the tiles to drink water: For tiles, tiles and other materials that need to be treated with swelled water, it is necessary to extend the time for swelled water treatment to fully approach the saturation state. In this way, it will not appear that when the adhesive is bonded to the cement due to the water absorption, the emptying and detachment occur.
Wall treatment should be resistant to cracking : In the treatment of materials like gypsum, the setting time should be strictly controlled. Because in the high-temperature dry weather, the molding of the gypsum is more difficult to control, so the setting time should be strictly controlled so that it can reach the standard compressive tensile strength and fineness. In the treatment of interior wall paints, due to the hot climate in summer, special attention should be paid to its stability, bonding strength and initial dry crack resistance. The approach taken at this time is to carefully observe the details and make detailed time recordings before making comparisons.

Raiders three, master thermal expansion and contraction, control the size

Decoration materials have the characteristics of thermal expansion and contraction. Summer temperatures are relatively high, and construction site temperatures can reach as high as 30 degrees. In winter, temperatures are low. Generally, the indoor temperature is about ten degrees or so. Such a large temperature difference, if not considered during the renovation, can easily cause deformation of the material. There are gaps and other conditions. To this end, note the following two points:
Pay attention to the compactness of the pavement : When paving the floor, the gap should be arranged more closely than before to avoid the gap becoming larger when the temperature decreases and affecting the appearance. Floor and wall joints can be used to form transitions on the floor, this way, not only deal with the wall and floor gap is too large drawbacks, but also played a beautiful role.
Plastic window should pay attention to the size: In the measurement and installation of plastic doors and windows, sliding doors, the size of the arrangement should pay attention to thermal expansion and contraction. Because steel is a material that is greatly affected by temperature, if it is too compact in size, it will have gaps and deformations due to lower temperatures in the winter, so there should be a slight surplus in size.

Raiders four, security must be in place

In summer, the weather conditions of high temperature, dryness, and humidity are likely to affect the construction site and materials. Therefore, the following safety precautions should be taken during the renovation:
Fire safety should pay attention to: high summer temperatures and high humidity, this time should pay attention to the safety measures in the circuit construction. As the temperature rises, it can easily lead to deterioration of the plastic of the wire and cause the insulation tape to melt. When using electrical equipment, such as electric saws and electric planers, the winding of wires should be avoided and strictly separated from flammable wood products and debris. So as not to cause fire due to heat effect. In addition, strict implementation of the requirements of the construction site for smoking, flammable and explosive paint materials should be concentrated in the place of ventilation and light.
Waterproof work should be done well: In the summer, decoration staff frequently use the sanitary equipment in construction to cause floor seepage. Therefore, in the case that the bathroom is not completed completely, do a good job in the discharge of water for personnel. Do not pour directly into the bathroom floor that has not been properly masoned, causing unnecessary trouble.
In addition, before the construction of the clay tile, the foundation of the construction should be kept clean and dry, and the construction should be carried out under the condition of cross-flow of sewage. Presumably, this is not a home owner's home project.
Material protection must be in place: Because of the coexistence of dryness and humidity in the summer, in the wood and wood keel projects, the vacant drying process is required to complete the production. Wooden ceilings need to draw attention to the fact that the amount of shrinkage is much greater than that of plaster, so after the material is purchased, it needs to shelter from the rain and avoid moisture. After installation is prevented, the degree of shrinkage is not the same as the cracking of the gypsum in the bone in the wooden ceiling.

Raiders 5: summer decoration is the most important

According to the traditional saying, summer is the hottest year, the highest temperature and the most masculine stage in the year. The decoration is a top priority for most of the owners: they do not trust the quality of the construction and go to the construction site to supervise the work tirelessly; if they want to make good use of materials, they will go to the building supermarket to take advantage of the material. Decoration is not easy, it is hard work under high temperature and heat, and it can be as easy as it is.
Digitization of the decoration of the province to personally monitor the hardships: In fact, in the digital age, the decoration can also be liberated from the traditional, tired oversight work, buy materials. It is understood that a lot of decoration companies nowadays have opened a digital decoration service, upload the status of the construction site, so that owners can master the construction progress through the network, and even construction details. If the owner feels unsatisfied, he can request the project manager to modify the request by telephone or network until he is satisfied. Therefore, when choosing a decoration company, it is best to ask in advance if you would like to provide digital decoration services.
Building materials can also save money to save money: Everyone is accustomed to visiting the mall to choose building materials, but it is time-consuming and strenuous. It is not necessarily cheap to buy materials. It is not worthwhile. In fact, there are also peace of mind to buy materials - buy building materials. The various materials used in the decoration of the building materials group will be complete, saving everyone the hard work of building materials stores. More importantly, according to the principle of “manpower is more powerful”, the price of building materials purchased by the group is usually about 10-20% cheaper than that of the stores.
The digital decoration eliminated the saddle horse Lawton that everyone supervised the work in summer, and the building materials group purchase allowed everyone to purchase materials at one-stop prices at a favorable price. The summer decoration was natural and effortless. It is understood that, in the decoration market in Shanghai, “I love my family” is an earlier company that opened digital decoration services. After a long period of exploration and experimentation, it has become more mature and perfect. The well-known, the lowest price of the city's lowest-cost love of building materials group buy reputation is also good, has become a new choice when many owners choose to buy building materials. In addition, the decoration and materials are provided by my loved ones, so there will be no wrangling, and the owners will be more relaxed in summer decoration. Interested owners can go to consult.
Finally, the owners should be reminded to pay attention to the construction period, summer decoration, and the weather is changeable. Walls, batches of walls, paintings, and other items should all be allowed enough time to avoid hidden dangers. Therefore, it is recommended that everyone should be properly relaxed when signing a decoration contract.

Entrance decoration Children's room decoration Painted door price window Interior decoration Air conditioning price Plasterboard ceiling Price of renovation Looking for fitment company How are you Floor tiles Bathroom sliding door Bathroom tile Bathroom door Bathroom ceiling material Bathroom door size Bathroom size Toilet water price Toilet ceiling Bathroom Waterproof bathroom Floor tile Plastic tile price floor tile

Exposed Shower Sets

Exposed Shower Sets,Universal Bathroom Shower Set,Shower Set For Bathroom,Hotel Shower Set

Kaiping Jenor Sanitary Ware Co., Ltd , https://www.jenorsanitary.com