1. Leave a little space for the ash of the shoes to leak to the bottom, and install the lights above the sink and gas stove. When you want to locate the floor drain of the bathroom, you must first think about it and measure the size. The floor drain is preferably located on one side of the brick. If it is in the middle of the brick, the floor drain will not be the lowest point no matter how the brick is tilted.
2. The bathroom air-conditioning outlets are not designed with switches, especially the bathroom electric water heaters. It is advisable to use a two-stage switch with a plug. If it is necessary to turn off the electric hot plug, it is dangerous.
3. Regarding the treatment method of the corner of the brick, in the final analysis, it is to see the level of the worker. If the level of muddy workers is good, and the tools for grinding tiles are better, you should not hesitate to choose a 45 degree angle. From the effect point of view, as long as the grinding is good, the practice of grinding the angle of 45 degrees is the most beautiful! If the level of the workers is really not good, then you still choose to use the angle bar, because the bad grinding 45 The angle approach is not as good as the effect of using a positive angle strip.
4. It is also very important to test the water pressure after the water pipes are drained. When testing, everyone must be present, and the test time is at least 30 minutes, and the conditions are allowed, preferably one hour. 10 kg of pressure, and finally no test to pass.
5. When the steel door is made, it must be considered that the size of the steel door frame protrudes from the wall, and the installation personnel are informed that the final door frame and the wall of the finished tile are flat, so that it is both beautiful and sanitary.
6. The door cover of the woodworker and the tiling of the mason are also to be matched. When the door cover is used, it is necessary to consider whether the ground below (either side of the two sides of the door) is to be tiled or other cement mortar to level things. Because the door cover is nailed in front of the tile, it is always wrapped on the ground. When cement is used in the future, if the cement and the door cover are stained, it will cause the door cover wood to absorb water and mold.
7. Be sure to breathe under the mattress and on the bed. The bed board is generally best with fir boards.
8. Make paint as much as possible with paper tape.
9. Pay attention to the purchase of lamps: generally try to use glass, stainless steel, copper or wooden (shelf), generally do not buy any iron coating, paint and the like, easy to fade.
10. Wash basins as much as possible with ceramic basins.
Barbed Wire,Stainless Steel Barbed Wire,Coated Barbed Wire Fencing,Pvc Coated Barbed Wire Fencing
Anping Xinlong Wire Mesh Manufacture Co.,Ltd. , https://www.hbzhaoxuan.com