10 Inch Rock Drilling Down The Hole DTH Hammer Drill

Model NO.: NUMA100
Mining Object: Metallic and Non-Metallic Ore Excavator
Trademark: NEW DIAMOND
Transport Package: Inner Package with Cartons, Wooden Outer Package
Specification: ISO9001: 2008
Origin: Hunan, China
High Air Pressure DTH Hammer
1. Lower energy consumption
2. Higher impact frequency
3. Easy and cheap maintenance
4. Long life, reliable

Faster Drilling Speed and Most Advanced Air DTH Hammer:
1.10 years manufacturing experience;
2. Certificate: ISO9001: 2008
3. Material: Carbide

It is a kind of valveless high air pressure DTH Hammer with foot valve.

It has the following advantages:

1. Valveless air distribution. More reliable.
2. Simple design of the piston, long life.
3. More efficient energy transfer, faster drilling speed, lower air consumption and lower oil consumption.
4. Fewer internal parts, simple structure, longer life, less failure and easier to maintain because all the parts are heat treated.
5. Easy to disassemble because the top sub, the drive chuck and the external cylinder are connected by multi-step thread.


Our advantages:

We have advanced production equipments & talented researchers & technicians & rich experiences in R & D and production.
We use the best quality raw materials.
We adopt advanced production technology & strict testing procedure.
We passed ISO9001 quality management system certification.
We accept OEM manufacturing and produce on your design.
Length    (Without Bit) Weight  (Without Bit) External diameter Bit Shank Hole Range Connection Thread
1510mm 288.00kg Φ226mm NUMA 100 Φ254-Φ311 API6 5/8"Reg
Working Pressure Impact rate at 1.7Mpa Recommended rotation speed Air consumption
1.0Mpa 1.8Mpa 2.4Mpa
1.0-2.5Mpa 18HZ 15-25r/min 22m³/min 45m³/min 60m³/min






 
Item Description Weight (kg) Part Number
1. Top Sub
2. "O" Ring of Top Sub
3. Breakout Ring
4. Check Valve
5. Spring
6. Compression Buffer
7. Air Distributor
8. Internal Cylinder
9. Piston
10. External Cylinder
11. "o" Ring of Stop Ring
12. Stop Ring
13. Breakout Ring
14. Drive Chuck
15. Drill Bit 
59.00
0.03
0.40
1.60
0.30
0.60
11.50
11.00
62.00
112.00
0.03
1.50
0.40
26.00
115.00
NN10001
NN10002
NN10003
NN10004
NN10005
NN10006
NN10007
NN10008
NN10009
NN10010
NN10011
NN10012
NN10013
NN10014
NN10015

Elevator Modernization

Elevator modernization (or lift modernisation) is the process of upgrading the critical parts of the elevator in order for it to be able to handle new technology, have better performance, improve safety, and even give the aesthetics an up-to-date appeal


Most elevators are built to provide about 20 years of service, as long as service intervals specified and periodic maintenance/inspections by the manufacturer are followed. As the elevator ages and equipment become increasingly difficult to find or replace, along with code changes and deteriorating ride performance, a complete overhaul of the elevator may be suggested to the building owners.

A typical modernization consists of controller equipment, electrical wiring and buttons, position indicators and direction arrows, hoist machines and motors (including door operators), and sometimes door hanger tracks. Rarely are car slings, rails, or other heavy structures changed. The cost of an elevator modernization can range greatly depending on which type of equipment is to be installed.

Modernization can greatly improve operational reliability by replacing mechanical relays and contacts with solid-state electronics. Ride quality can be improved by replacing motor-generator-based drive designs with Variable-Voltage, Variable Frequency (VVVF) drives, providing near-seamless acceleration and deceleration. Passenger safety is also improved by updating systems and equipment to conform to current codes.



Components needs to be replaced in different elevator modernization plan

Component Scheme of elevator modernization plan
Refurbishment work Partial modernization Full modernization Full replacement
Elevator car
Sling No No by building owners Yes
Door operator No by building owners Yes Yes
Cab design by building owners by building owners Yes Yes
Car doors by building owners by building owners Yes Yes
Car fixtures Yes by building owners Yes Yes
Wedges connected to the governor No No Yes Yes
Additional phone/intercom if they don't equipped by building owners Yes Yes Yes
Traveling cable No Yes Yes Yes
Hydraulic rams No No No Yes
Wire ropes No by building owners Yes Yes
Shaft
Counterweight No No No Yes
Guide rails No No No Yes
Buffers No No Yes Yes
Electrical components No No No Yes
Tapehead No Yes Yes Yes
Limit switches No Yes Yes Yes
Wiring No Yes Yes Yes
Compensations No No No Yes
Lobby
Shaft door components by building owners by building owners Yes Yes
Shaft doors by building owners by building owners by building owners Yes
Hall fixtures Yes by building owners Yes Yes
Machine room
Machines No by building owners Yes Yes
Controllers No Yes Yes Yes
Removal of the selector by building owners Yes Yes Yes
Overspeed governor No No Yes Yes
Additional unintended car movement protection device if they don't equipped by building owners by elevator safety code in countries
Backup battery or uninterruptible power supply No Yes Yes Yes




Benefits of elevator modernization

Modernization can greatly improve operational reliability by replacing mechanical relays and contacts with solid-state electronics. Ride quality can be improved by replacing motor-generator-based drive designs with Variable-Voltage, Variable Frequency (VVVF) drives, providing near-seamless acceleration and deceleration. Passenger safety is also improved by updating systems and equipment (such as double brake system, unintended car movement protection device on the brake system etc.) to conform to current codes.




With CEP traction elevator modernization, we use the existing elevator structure while upgrading the ride quality and reliability with state-of-the-art components. Upgrade to a CEP closed loop door operator or a sophisticated, energy saving VVVF inverter.

CEP traction elevator modernization can include:

  • CEP Microprocessor Based Control System
  • CEP Microprocessor Based Efficient Dispatch System
  • Energy Efficient AC Drives or SCR Drives on Existing AC Gearless Machines
  • Traction Machines (Geared / Gearless)
  • Rope Brake System
  • CEP Closed Loop Door Operating System
  • Car & Hall Pushbutton Fixtures & Indicators
  • Car & Counterweight Roller Guides
  • Seismic Upgrades
  • Security Upgrades
  • Cab Interior Renovations or Cab Replacement

NOTE: Complete tear-out modernizations are available.

Contact us TODAY for Right Modernization Package Available


OTIS Elevator Modernization, Thyssen Elevator Modernization, KONE Elevator Modernization, GiantKONE Elevator Modernization, ThyssenKrupp Elevator Modernization, Schindler Elevator Modernization, XJ Schindler Elevator Modernization, Xizi OTIS Elevator Modernization, Mitsubishi Elevator Modernization, Shanghai Mitsubishi Elevator Modernization, Fujitec Elevator Modernization, Hitachi Elevator Modernization, Toshiba Elevator Modernization, Hyundai Elevator Modernization, LG Elevator Modernization, Sigma Elevator Modernization, Express Elevator Modernization, GUANGRI Elevator Modernization, FUJI Elevator Modernization, BLT Elevator Modernization, CANNY Elevator Modernization, SJEC Elevator Modernization, KOYO Elevator Modernization, IFE Elevator Modernization

Elevator Modernization,Lift Modernisation,Passenger Lift Modernization,Passenger Elevator Modernization

CEP Elevator Products ( China ) Co., Ltd. , https://www.zjelevatorcontrolsystem.com