The owner's new home acceptance note

Home decoration is generally divided into five aspects of acceptance (water, electricity, tile, wood, oil). According to the national acceptance standard and the quality acceptance standard agreed in the construction contract, all aspects of the project are accepted. As the non-professional acceptance of the owner, the following points should be noted:

First, water: pools, basins, sanitary ware, water pipes, heating, etc.

See: whether the installation of the pool, basin, and sanitary ware is smooth, firm, and straight; whether the upper and lower waterway pipelines are straight, whether the fasteners are installed, and whether the joints are leaking or seep;

Second, electricity: power lines (sockets, switches, lamps), television, telephone.

Look: Whether the power line uses the national standard copper wire, the general lighting and socket use the 2.5 square line; the kitchen and bathroom use the 4 square line, if the power line is multi-strand wire but also solder processing can be connected to the switch socket; TV and telephone The signal line should be kept at a certain distance from the power cable (not less than 250mm). The installation of the lamps should use metal hanging points, and they should be tested one after the other.

Third, tile: tile (wet paste, dry paste), stone (wet paste, dry hanging).

Look: Before the construction, we need to pre-select the pre-selection process. Divide the materials of different specifications into several categories, place them in different rooms or planes respectively so that the bricks are aligned, and use the material of the individual curling angles as the cutting material. Use lower quality materials to produce better results.

Fourth, wood: doors and windows, ceiling, closet, wall skirts, heating cover, floor.

Look: Select wood must be selected to dry the material, so as to avoid future deformation; wood to be painted with fire-resistant anti-corrosion materials can be used before, blockboard to use high quality materials. Large-scale ceilings and skirts are not less than 8 fixed points per square meter. Metal hanging points are used for suspended ceilings. Materials used for doors and windows should be made of better materials to prevent deformation. The wood on the floor should be larger (not less than 6×6)

Fifth, oil: paint (clear oil, mixed oil), paint, paste, soft package.

Look: The most important thing is the surface treatment of the decoration. The paint must be made of high-quality materials. Before the brushing or painting, the surface treatment must be done. The mixed oil is first put on the surface of the wooden device and the putty is smoothed. After the polishing, the paint is sprayed on the surface. Before the wall paint is applied again, it is necessary to use a primer (in order to block the acid-base reaction between the wall and the top coat) to prevent discoloration of the wall surface.

Experience with three trees paint living room ceiling paint socket TV decoration switch heating floor tiles kitchen ceiling cabinets closet doors floor tiles ceramic tile specifications

Swirl Diffusers

Guangzhou Jointair Co., Ltd. , https://www.nbjointair.com