Steel Pipe Knowledge: 4 Ways to Keep Straight Seam Steel Pipes
1, choose the appropriate venue and warehouse
(1) The site or warehouse where steel pipes are to be stored should be located in a clean, well-ventilated area away from factories and mines that produce harmful gases or dust. Remove weeds and all debris on the site to keep the steel pipe clean
(2) In the warehouse, it is not allowed to pile together materials that are corrosive to the steel, such as acid, alkali, salt, and cement. Different types of steel pipes should be stacked separately to prevent confusion and prevent contact corrosion
(3) Large-sized steel, steel rails, steel plates, large-diameter steel pipes, forgings, etc. can be stacked in the open air
(4) Small and medium-sized steel, wire rods, steel bars, medium-diameter steel pipes, steel wires, steel wire ropes, etc., can be stored in well-ventilated sheds, but must be placed under the mattress.
(5) Some small steel pipes, thin steel plates, steel strips, silicon steel plates, small-diameter or thin-walled steel pipes, various cold-rolled and cold-drawn steel pipes, and high-price, erodible metal products, which can be stored in the warehouse
(6) The warehouse should be selected according to the geographical conditions. Generally, an ordinary closed warehouse is used, that is, there is a warehouse with a roof on the roof, tight doors and windows, and a ventilation device.
(7) The warehouse requires clear ventilation for the sunny days, close the moisture barrier for rainy days, and always maintain a suitable storage environment.
2, reasonable stacking, advanced first release
(1) The principle of stacking is that under the conditions of stable stacking and ensuring safety, it should be done according to the type and specifications, and different types of materials should be palletized separately to prevent confusion and mutual corrosion.
(2) It is forbidden to store articles that are corrosive to the steel pipe near the nibbling position.
(3) The bottom should be elevated, firm and flat to prevent moisture or deformation of the material.
(4) The same kind of materials are stacked separately according to the order of storage to facilitate the implementation of the principle of advanced preemption
(5) Formed steel stacked in the open air must have a wooden mat or stone below, and the surface of the surface should be slightly inclined to facilitate drainage, and the material should be laid flat to prevent bending deformation.
(6) Stacking height, manual operation not exceeding 1.2m, mechanical operation not exceeding 1.5m, width not exceeding 2.5m
(7) There should be a certain passage between åž› and ,, and the inspection road is generally O. 5m, access channel depending on the size of the material and transport machinery, generally 1.5 to 2. Om
(8) The bottom of the raft is raised. If the warehouse is a rising cement floor, raise the height. 1m can; if it is mud, must be high. 2~0.5m. If it is an open space, the cement floor shall be filled with O·3~O·5m, and the sand and mud shall be filled with 0.5~O. 7m
(9) Angles and channel steel stacked in open air should be laid upright, that is, the mouth is facing down, and the I-beams should stand upright. The I-groove of the steel pipe cannot face upward to prevent the water from rusting.
3, protective material packaging and protective layer steel factory pre-coating preservatives or other coating and packaging, which is an important measure to prevent material corrosion, in the process of transport handling must pay attention to protection, can not be damaged, can extend the storage of materials the term
4, keep the warehouse clean, strengthen the material conservation
(1) Before materials are put into storage, care should be taken to prevent rain or impurities from being mixed. For materials that have been rained or stained, different methods should be used to wipe them according to their properties. For example, a high hardness steel wire brush and a low hardness cloth can be used. , cotton and other things
(2) After the materials are put into storage, they should be inspected frequently. If there is rust, the rust layer should be removed.
(3) After the surface of the general steel pipe is removed from the net, it is not necessary to apply oil, but for the high-quality steel, alloy thin steel plate, thin-walled pipe, alloy steel pipe, etc., the internal and external surfaces of the steel pipe must be coated with antirust oil after derusting and then stored.
(4) For steel pipes with severe corrosion, it is not suitable to store them for a long time after derusting. Buy the straight-seamed steel pipe, large-diameter straight-seam steel pipe, and thick-walled straight-joint steel pipe as soon as possible. Go to Kunlian steel pipe and call the sales hotline:.
Welcome to visit us, we are the factory of Non Slip Floor Mats producer from China, this series made of pvc and widely used for the runners of wet area, like swim pools and vegetable supermarket, also contain chemcial lab or workshop. General of four size mm and Max 8.0mm for customized orders.
3.5mm | Disposable |
4.5mm | General type |
5.0mm | High quality |
6.0mm | Higher quality |
8.0mm | Customized |
Welcome to visit us.
Non Slip Mats,Indoor Floor Mat Non Slip,Non Slip Flooring Mats,Stay Put Non Slip Matting,Anti Slip Bath Mats
Jiangyin Yining E-Commerce Co., Ltd , https://www.jypvcmatyining.com