Shower room installation process introduction

The shower room has a small footprint, can effectively separate dry and wet, and can play a role in heat preservation in winter. However, many owners' shower rooms have many installation quality problems such as water leakage, watertight installation, poor sliding and sliding door sliding. Let's take a look at the precautions in the shower room installation process to avoid errors during installation.

First, the shower room installation preparation

Before installing the shower room, first prepare the materials and tools.

Material preparation: The materials used in the installation of the shower room include accessories such as frame, tempered glass, handle and pulley.

Tool preparation: In the shower room installation process, you still need a lot of tools. Before installation, these tools are all ready. The tools used for this installation include tape measure, pencil, impact drill, hand hammer, electric screwdriver, glue gun, manual screwdriver, wire cutter, etc.

Second, the shower room frame fixing method

The first step in the installation of the shower room is to find a location, punch holes, and then fix the border. The work needed to find and punch holes

More, the operation is more complicated. Let's take a look at how the installer is doing this step.

1. Determine the drilling position: use the tape measure + pen shower room must be fixed. The fixing method is generally to use the screw. The hole on the aluminum alloy frame of the wall has been reserved. The corresponding position is to mark the corresponding position of the wall. The method is to put the border on the wall, the tape measure to ensure the correct position, and then mark the wall with a pencil.

2, punching: the use of impact drill the first step: after setting the position, the next is the hole. The punching is also carried out in two steps. First, a shallow hole is drilled on the wall by using a drill with a circular drilled hole.

Construction Tips: Because the wall of the bathroom has been covered with wall tiles, it is relatively hard. To make drilling easier, you can wet the drill bit. In addition, you can pour some water while punching.

Step 2: After punching out the prototype mark hole, the next step is to use a spiral drill with a stronger impact. On the basis of the shallow holes that have been punched, make a deeper hole.

3. Install the rubber particles: Before using the hammer to nail the screws into the wall, firstly, the expansion rubber particles need to be installed in the holes, and the rubber particles can better tighten the screws. Use a hand hammer to knock the rubber into the borehole.

4. Fixed frame: After the above steps are completed with an electric screwdriver, you can install the shower room frame, place the bottom frame on the water barrier, and then fix the frame. The method is to use an electric screwdriver to nail the screws into the wall to secure the frame.

Third, shower room glass and top frame installation

After fixing the frame, the glass and top frame of the shower room are installed. If you install it carelessly, it is easy to see problems such as not being able to seam it.

1. Install tempered glass If the shower room consists of two pieces of tempered glass and two sliding doors, after installing the bottom frame and the wall frame, the next step is to install two pieces of tempered glass. The installation of tempered glass first needs to be placed in a position, and then the bottom is fixed. These two pieces of tempered glass do not need to be moved, so they need to be fixed with accessories. The first is to use the U-shaped accessory card holder, then use pliers and a screwdriver to secure the nut and screw to the bottom frame connection.

2, install the top frame

The first step: After the installation of the two tempered glass is completed, the fixed top frame can be installed. In fact, after the top frame is secured against the wall frame, it is necessary to try to check whether the docking is accurate.

Step 2: Before the formal fixed installation, it is also necessary to locate and drill holes to determine the fixed position.

Step 3: Handle the screws attached to the fixed part of the top frame in advance so that the fixed glass and sliding door can be installed next. Step 4: After drilling, installing the rubber particles, and handling the joints, you can use the electric screwdriver and screws to fix the top frame.

Fourth, shower room sliding door and handle installation

After the main frame is installed, the installation of the sliding door and the handle is left. The importance of sliding doors is self-evident. Installation must be carried out with care and must be adjusted to ensure smooth sliding and closed without seams.

1. Install the sliding door wheel

Holes for mounting the wheel have been reserved on the general sliding door glass. Moving the door requires the use of a pulley. First, the two wheels above the upper sliding door need to be installed. After the wheel is installed, it is placed in the corresponding position, and then the lower wheel is debugged.

2, fixed sliding door

After the sliding door is placed, it needs to be fixed. Fixing does not mean that it cannot be moved at all, but does not let it out of the frame. The fixing method is still the same, using pliers and a screwdriver to fasten the connector.

3, debugging sliding door

After the sliding door is installed, there must be no less debugging. Try to see if the sliding door is open and closed smoothly, and whether it is closed without gaps. If there is a gap, you need to take measures to debug it.

4, install the sliding door handle

The sliding door also needs to be fitted with a handle, and the handle installation is relatively simple. First separate the handles, then align the holes in the glass and fix them with a screw connection.

5, the gap is coated with glass glue

After the basic installation of the shower room is completed, it needs to be waterproof. Using glass glue sticks, glass glue can be applied to aluminum frames and walls to prevent future water penetration.

6, the installation finishes

At this point, the installation of the shower room has been completed, and finally the finishing work. Wipe the entire shower room with a rag, etc. In addition, install the tools, remaining accessories, etc., and pay attention to the finished product protection.

Folding Screen

Folding screens have long been admired for their versatility and aesthetic appeal. These portable and flexible room dividers have been used for centuries to create privacy, define spaces, and add a touch of elegance to any interior. Made from a variety of materials such as wood, metal, or fabric, folding screens offer endless design possibilities to suit any decor style. Whether you need to separate a living area from a dining space, create a dressing area, or simply add a decorative element to a room, folding screens provide a practical and visually appealing solution. With their ability to fold and unfold, these screens can be easily moved and adjusted to meet your changing needs. From traditional to modern, folding screens are a timeless addition to any home or office.

Folding screen,Room divider,Privacy screen

Jinwu Glass Fiber Co., Ltd , https://www.jwnetwindows.com