Several points of decoration acceptance construction

There are many aspects of acceptance of renovation construction, the following is your introduction

(1) After the renovation work is completed, the decoration person and the responsible person of the decoration company jointly submit an application for acceptance to the management office.

(2) The management office organized acceptance personnel (electrical and mechanical maintenance team supervisors and technical personnel, public affairs group managers and administrators) to conduct on-site inspection and acceptance of the decoration within the same day. If there is no violation of the regulations, the decoration shall be handled according to the following procedures: If any violation is found, follow the rules for handling the violation.

(3) If the acceptance of the project is completed, the head of the Public Affairs Section of the Management Office shall sign the "Prequalified Qualification" in the column "Completion Acceptance" in the "Renovation Application Form" and sign the name and date.

(d) The security team of the management office shall regain the construction permit. If there is any loss, the decoration company shall provide certain compensation.

(e) The decoration company left the site on the same day.

(VI) One month after the decoration was accepted and used, the Public Affairs Section of the Management Office shall re-examine the decoration construction organization. The re-inspection is not a problem. The head of the Public Affairs Group indicates in the “Renovation Application Form” that “Re-qualification” , To the director of the management office for approval, the Finance Department returned the decoration of the decoration and decoration company decoration deposit.

(7) When the decoration construction is accepted, if the decoration person has violated the rules of decoration, the head of the public affairs department shall, according to the situation, make a valuation according to the provisions, list the amount of the deduction, and after the agreement of the director of the management office, the deduction of the list will be made to the decoration person. A copy of the financial group is deducted by the financial team as follows:

1. First deduct the money from the renovation company's decoration deposit;

2. The renovation company's decoration deposit is not enough to compensate the deduction, and then from the decoration of the decoration of the deposit to be deducted:

3. After deducting the decoration of the decoration of the deposit still can not compensate for the deduction, the repairer is required to give compensation;

4. The decoration data will be archived and stored for a long time.

Entrance decoration restaurant decoration

Industrial Peristaltic Pump

Industrial Peristaltic Pump are tested in various pilot or large-scale application scenarios. The flow range is wide, and the pump supports speed regulation, which can meet the needs of customers for various liquid additions. The pump supports external control to start and stop, and customers can control multiple pumps at the same time through PLC, which has reached production requirements. Good electromagnetic compatibility ensures stable and reliable operation.
Typical applications: Membrane treatment technology, chemical pharmacy, mining flotation, biological pharmacy, reactor, etc.

Industrial Peristaltic Pump,Wastewater Treatment Pump,Bioreactor Peristaltic Pump,Big Flow Rate Peristaltic Pump

Baoding Chuangrui Precision Pump Co., Ltd. , https://www.chuangruipump.com