Pre-clearance construction procedures, steps, purchase notes

The first one is to design the position first. Before the start of work, the design must be clear. Don't change it temporarily, change materials, time, labor, small changes, big changes, do it better, it is best not to change. . Positioning the design, and then is to find the construction team, and more to see the construction site of several construction teams to see the master's work, the master's man, the master is good communication, not necessarily a cheap construction team, it must be good, and some Things are dead, the price is very similar, there is not much difference. But compare more. It's better to find a better construction head, and find a construction head that is too busy. Because he is busy, he won't necessarily be able to reach your new house every day. Your problem cannot be solved in time. After selecting the construction team.

Second, hit the wall, hit the wall do not let the construction team to fight, because the construction team is also outside the professional to ask the teacher to pay the wall, how much they want to make some money, but not as much as the decoration company. You can ask the community how much the wall hit the master fee? Compared with the construction team, if it is lower than the construction team, this item can be subtracted from the construction team's work cost. In this way, as long as there is no black handling can generally save a few hundred dollars. There is also an air-conditioning hole, which is generally a hole and asking price of about 30 yuan, but if you are familiar with a lot of holes, you can price a hole at 20 yuan. When you hit the wall, put the air conditioning hole on it. Every day, the site should be clean and clean. It is most important because after the material is introduced into the market, the location of the materials must be clearly stated. When the regular decoration company stacks, separates, separates water materials, electric materials, carpentry materials, masonry materials, etc. Then when the materials are handed over to the construction head, or when the master of the direct process must give him the list, otherwise some things are bought, I do not know where to go, and the owner is not likely to be on the scene every day.

In the third item, water and electricity are slotted. The drawings on the wall must be copied and affixed to the walls of the new house. The master can know the drawings, and the direction of water and electricity must be marked on the wall and constructed according to the plan. During this period, the industry learned a lot about the knowledge of cabinets, and the water and electricity diagrams of the cabinets should be specific. In this way, if the cabinet company of the cabinet company is set up, the designer can produce a water and electricity diagram and give the water and electricity maps to the water and electricity masters. If they let the woodworking engineer pay for the cabinets, the owner must look at it more. Ask the cabinet company salesman, the size of the hanging cabinet, the lower cabinet, the size of the hood, the size of the sink, and the size of the sink cabinet. The best use of this chart is to let the technician who is familiar with the size of the cabinet cabinets help you to locate, and some homes. Most of the cabinets that are made of electrical appliances are not so reasonable in size. Because it is certainly not a professional designer's hydropower diagram. There is always a difference in size. Professional people do professional things, you worry. Microwave ovens, rice cookers, disinfecting cabinets, backup power supplies, and whether the space for operating countertops is reasonable, etc., are all more comprehensive considerations.

In the fourth item, water and electricity were slotted and construction was performed according to the plan. According to the plan construction, before the closure of the wall, the owner must pay attention to whether there is need to change the place, no, it is necessary to test the pressure of the waterway. Must test pressure. Circuit, using a multimeter, try to pass and break. Each circuit is open.

Materials that need to be purchased:

1, 3-4 slices of the slotted wall, a price of 25-35 yuan, good quality.

2, Liansu line pipe, Gu or other brand diameter 16, diameter 20 line pipe root, the price of 1.55-1.85. Fittings: Straight, elbow, three-way, 16- or 20-line tube cards with several packs, one pack is 50 packs, price 3-5 yuan. The quality of the nails on the tube card is not the same.

3, fine Zhasi, about half a catty, nails about 1 kg, line pipe, water pipe fixed. 32, 47, 62 shot several boxes.

4. For single-core single-stranded lines, do not take the risk of counterfeiting for a few dollars.

5, waterway, selection of Taurus pipe, if the owner of the bathroom long pipeline, large bathroom, span, want to save money on the material, with the Taurus tube slightly cheaper than Ikon. Taurus Liang Wei's materials will be 200 yuan cheaper, but the cost is 200 yuan more expensive, the actual cost is almost the same. However, some construction teams, even if you find the installation of Ai Kang's package, his work fee is also a lot of money, then it is better to buy the Taurus pipe, and let the construction team install themselves, which will be cheaper. If the materials are accurate, they can be used with Ai Kang. There is no waste, but we must pay attention to the positioning. When Ikon is changed to one, the fees charged by some students, washing machines, and changes in the location cost 30-50 yuan, which is not worthwhile.

6, Huang Laguan several roots, generally a little different in diameter, a little difference, the district's small shops do not buy, expensive outrageous. Most js will sell 1 yuan to 2 yuan a roll, or a box, but see if the paper is transparent, most of the transparent is a regular one, can see the number of meters, thickness.

7. Calculate the area of ​​floor tiles and wall tiles. Shaped kitchen and bathroom tiles should be wasted a little. According to the actual area, they should be more than half to 1 square. There are also three to five tiles for floor tiles. If you have a large area, you must have seven, eight, or ten more pieces of the budget. Also, the size of the ground is the same as the size of the brick you purchased. If it is the same amount of waste, it is less. That is, 3 meters wide kitchen, if you use 300 tiles, less waste. There is also a slight difference between horizontal tiles and vertical tiles. How high, have to consider early, calculate well, when buying, not too much, not too little, make up bricks, tolls, spend time, and a batch of bricks have different colors, try to be a little more, as long as Do not soak, you can retreat. Keep your documents well.

8, the arrangement of floor drains, is reasonable, the number of water pipes, the number of small can be the nearest, the number of more, you can go to the pvc pipes sold under the plumbing will be cheaper to buy the store.

9, switch the bottom box, what brand of switch you want to use, then the bottom box is supporting. Do not use water in the bottom box. The price of the bottom box brand is around 2 yuan. There are many types of 86 now, and it is also possible to use a few less than 118 types, and it is good to use several types of 118, the same brand, where the switch is more concentrated. There is a difference in the level of installation so as not to clutter the walls.

10, the positioning of sanitary ware, sanitary ware also want to use what brand of sanitary ware, from the wall of the hole away, do not have to buy a new house, you can put your ware brand instructions to the master to see, good positioning, direction. Positioning of electrical appliances and sinks. Electric appliances and sinks do not necessarily buy new homes, but at the very least, Chinese-style smoke machines are used, as well as European ones. The sinks are larger, or smaller, left-handed, or right-handed. There is a disinfection cabinet. This must be considered first.