If the new house decoration is neglected with waterproof, if there is a leak in the bathroom and the kitchen, it will form a string of water leaking downstairs in the floor, affecting the relationship between the neighbors, and may cause serious property loss and legal disputes. If you refill the water after your stay, the cost is about 3-5 times before the renovation. Today's inventory of waterproof projects and acceptance of the need to pay attention to matters, we must pay attention! 1 â–² waterproof details 1, the basic first deal with home construction waterproof construction, the base must be processed to achieve the primary surface smooth, solid, clean, no floating ash and oil. Treatment method: Carefully clean the base surface to remove floating dust, remove cement agglomerates and loosen the base layer, and perform special treatment on the roots, drainage holes, yin and yang angles, and voids left on the wall after the hydropower reform. Renovation of the first network to remind after the completion of treatment with a brush to finely sweep the dust on the base surface, take the appropriate amount of waterproof coating diluted to milk, use the drum to dilute the diluted material to the bottom, the first wall after the brushing waterproof surface, do Dust thoroughly. 2. In addition to the bathroom that must be waterproofed, some families also introduce the waterway into the balcony, basement, etc. during the renovation, while the families that use the floor heating need to pipe the entire room floor. It is necessary to do waterproofing in places that are prone to flooding. Treatment method: For the buried water pipe in the wall, it is necessary to remove the groove larger than the pipe diameter, plaster the groove, and brush the waterproof coating. If the original drainage and sewer pipes and floor drains are changed during the renovation, waterproof measures must be taken in the surrounding area. 3. The height of the bathroom is 1.8 meters high. The general shower or nozzle is installed around 180 centimeters high. If the waterproof is done low, the long-term spray will cause the water to penetrate the wall, which will make the wall moldy, wall decoration coating or tile. Peel off so that it does not provide a waterproof effect. Treatment method: Non-shower wall can not be less than 35cm in principle waterproof paint. However, in order to enhance the waterproof effect, it is recommended that consumers achieve a uniform height of 180 cm. In addition, it is recommended that the waterproof height be the top for light walls and self-built light walls that have been remodeled in toilets. Waterproof coatings must be brushed to the 1.5mm thickness of the National Acceptance Specification.
2 â–² waterproof inspection 1, bathroom to do the 24-hour closed water test after the completion of the transformation, waterproof will be done immediately. To test the waterproof effect is good, it is mainly through the closed water test. The closed water test is usually carried out after the last time the waterproof coating is applied for 12 hours and the waterproof coating is firmly bonded to the primary structure of the base layer. Renovation of the first network to remind specific operations need to seal the door and the water outlet, in the bathroom floor full of water to reach 3-5 cm in height, and make a mark, if there is no significant decline in the water within 24 hours, especially downstairs home roof No leakage occurred and the water-proof was passed. If the acceptance fails, the waterproofing project must be redone and re-accepted. 2. Lightweight walls can be water-drenched. Waterproof test for lightweight walls should be taken. Water pipes should be sprayed on the wall of the waterproof paint continuously for 3 minutes from top to bottom, and the wall should be observed after 4 hours. Whether there will be infiltration on the other side, if there is no penetration phenomenon, it can be considered that the wall waterproof construction acceptance.
3 â–² â–² Tips Waterproof layer damage should be protected After the waterproof layer is completed, it is necessary to continue to apply tiles on the surface. It is easy to cause damage to the waterproof layer. If the damaged part is not repaired or found, it will cause future damage. Leakage, so apply a protective layer. The repair is usually made by adding cement to the interface agent and then adding a rigid waterproof material. Stir the brush evenly. The strength of the mixture after condensation is higher than that of the common concrete material. At the same time, the rigid waterproof material is added, so that the waterproof can be perfectly safe.
4 â–² â–² â–² kitchen, balcony is also the focus of water-proof due to kitchen washing vegetables, kitchen utensils will have different levels of water overflow, easily lead to leakage of water along the floor leakage leakage, resulting in leakage, so the kitchen also need to do waterproof protection. Xiao Bian reminded that it is generally recommended that the kitchen floor and wall should be turned over 30 cm to make it waterproof, and that the wall placed on the sink should be turned up to 150 cm to set the waterproof layer. Exposed balconies must be waterproofed in order to be exposed to the external environment, so as to prevent rain and snow from seeping downstairs.
2 â–² waterproof inspection 1, bathroom to do the 24-hour closed water test after the completion of the transformation, waterproof will be done immediately. To test the waterproof effect is good, it is mainly through the closed water test. The closed water test is usually carried out after the last time the waterproof coating is applied for 12 hours and the waterproof coating is firmly bonded to the primary structure of the base layer. Renovation of the first network to remind specific operations need to seal the door and the water outlet, in the bathroom floor full of water to reach 3-5 cm in height, and make a mark, if there is no significant decline in the water within 24 hours, especially downstairs home roof No leakage occurred and the water-proof was passed. If the acceptance fails, the waterproofing project must be redone and re-accepted. 2. Lightweight walls can be water-drenched. Waterproof test for lightweight walls should be taken. Water pipes should be sprayed on the wall of the waterproof paint continuously for 3 minutes from top to bottom, and the wall should be observed after 4 hours. Whether there will be infiltration on the other side, if there is no penetration phenomenon, it can be considered that the wall waterproof construction acceptance.
3 â–² â–² Tips Waterproof layer damage should be protected After the waterproof layer is completed, it is necessary to continue to apply tiles on the surface. It is easy to cause damage to the waterproof layer. If the damaged part is not repaired or found, it will cause future damage. Leakage, so apply a protective layer. The repair is usually made by adding cement to the interface agent and then adding a rigid waterproof material. Stir the brush evenly. The strength of the mixture after condensation is higher than that of the common concrete material. At the same time, the rigid waterproof material is added, so that the waterproof can be perfectly safe.
4 â–² â–² â–² kitchen, balcony is also the focus of water-proof due to kitchen washing vegetables, kitchen utensils will have different levels of water overflow, easily lead to leakage of water along the floor leakage leakage, resulting in leakage, so the kitchen also need to do waterproof protection. Xiao Bian reminded that it is generally recommended that the kitchen floor and wall should be turned over 30 cm to make it waterproof, and that the wall placed on the sink should be turned up to 150 cm to set the waterproof layer. Exposed balconies must be waterproofed in order to be exposed to the external environment, so as to prevent rain and snow from seeping downstairs.
Decoration waterproof
Flexible lift gate is a flexible soft curtain door, inside and outside the two curtains, curtains used between the aluminum beams connected with a vertically movable rail, the roof beams have levels not in the same straight line and hangar large plants in particular be applicable. Flexible lift door installation does not take up interior space in the hole inside. When the fiest move to open the door, and finally superimposed over the hole. Off event curtain rail first and then fall down until it is completely closed.
Flexible Gate,Flexible Pvc Aircraft Folding Up Door,Steel Structure Fabric Flexiile Door,Exterior Automatic Flexible Door
Shenzhen Hongfa Automatic Door Co., Ltd. , https://www.hongfadoor.com