Water circuit transformation is the most important, but for general decoration companies, this is also the most important profit point. Therefore, when designing, it is necessary to strictly control the budget. General decoration companies will use the actual data on the site as the specific figures for the transformation of the water circuit. It is difficult to estimate the reason and refuse to tell you in advance how much money will be spent on the hydropower reform. As a result, when checking out, you often find yourself paying more than a few thousand dollars for this project.
<<<Links: Interpretation of hydropower reforms
Control drawings strict budget
Before the signing of the renovation contract, the designer is required to show the water circuit transformation drawings and calculate the number of possible transformations of telephone lines, power outlets, switch panels, waterway reconstructions, cable television lines, and network cable transformations. Reasonable expenses to avoid excessive increase in costs. This article was edited and edited by the city's hunters and reprinted from the City Hunting House | Fuzhou Real Estate Network http://, thank you for reprinting your reservation.
When the bottom is reached, the location of the hydropower needs to be determined one by one to the site. It is best to record the direction of the lines and the water pipes by photos or videos. The original developer will have some outlets and decide in advance whether to change it. If it is not replaced, the workers must be taken care of by themselves. Otherwise, they are often unaware of who is damaged and need to buy it again.
In each room where to place the light must first be determined; the kitchen should have more power outlets; pre-installed several air-conditioning to install, is the cabinet machine or hang up, in order to determine the location of the socket; to make a good reservation lamp, bath place, kitchen Flue position and future checkpoints; if surround speakers, set aside an audio cable exit opposite the living room TV wall for the final placement of the surround speakers; toilets should be equipped with washout mop outlets, if you wish, you can buy a mop pool The overall cabinet is best determined before the start of work, to facilitate the determination of the future transformation of water pipes and gas pipelines. Before starting work, workers should be allowed to determine the wall distance between the toilet and the wash basin so that there is sufficient time to choose the right bathroom facilities.
Mid-term acceptance to avoid rework
Such as kitchen and bathroom waterproof, buried underground water and electricity pipelines, after the construction of the floor tiles found that water is not qualified, the wiring pipeline is not connected, plumbing pipeline is not connected or water leakage, it can only be reworked.
The floor drain of the washing machine is best not to use the deep water seal floor drain, because the water is too slow to meet the needs of the washing machine. Strong and weak wires cannot be in the same pipe and there will be interference. The concealed line pipe must be firmly fixed, otherwise the wall is easy to crack.
Leave a floor plan after completion
After the completion of acceptance of the water and electricity, it is best to call the water electrician out of the floor plan and the elevation of the room, bathroom, kitchen, and balcony. The direction of the circuit and waterway should be marked clearly, and the size must be marked. The wire conduit should be unobstructed and the wires in the conduit should be drawn back and forth by hand. It should be able to twitch in order to replace damaged wires later. Use the electric pen or socket detector to check the socket wire order. It must be left zero and right fire on the ground wire.
Plumbing pipes must be pressure tested after they are laid, and they are qualified to do the next process to prevent damage caused by leaking pipes. Waterproofing is recommended for wire connections in kitchens and bathrooms. Joints can be taped with high-pressure self-adhesive tape and black tape. Installation of metal shells with a height of less than 2.4 meters must be protected grounding, and the toilet must be made of waterproof sockets.
Hydropower Renovation Socket TV Renovation Decoration Design Room Toilet Living Room TV Wall Decoration Find Decoration Company How Do You Decorate The Living Room Kitchen Cabinet Door Bathroom Size Bathroom Vanity Basin Overall Bathroom Toilet Design Toilet Waterproof Bathroom Tiles Bathroom Leakage
Wall Tile Cutter,Light Duty Tile Cutter,Porcelain With Backing Plate,Tile Cutter With Single Rod
NINGBO SANDING EDGE MECHATRONICS INDUSTRY AND TRADE CO., LTD , https://www.sandingedge.com