As we all know, house decoration is a very tedious thing, especially in the late stage of entry, we often encounter a classic battle on the Kaner, that is, first install the floor or first install the door ? Although from the aspect of the process, there is no special provision for which door and floor is first installed, and at the same time, it will not have a real impact on the final decoration effect. From the actual situation, there are also the first door, and the first floor is installed. There is also, the following will go with the small series to see it, I hope to provide some help to your decoration, to help you have a comfortable home.
First install the floor or first install the door
For this problem, I believe that most homeowners are confused. In fact, if the hall in the home is paved with floor tiles, and the sleeping area is floored instead of the whole house, then it is recommended to install the door directly. Say, is it the first floor or the first door? In fact, the answer is not fixed, but under normal circumstances, professionals recommend the first floor, for the following reasons:
1. If you install the ground watch block, you can ensure the gap between the door and the door. If you first install the door frame, even a skilled installation master can not predict the thickness of the floor to retain the size, plus a large number of variables If the thickness stays large, not only is it ugly, but also the sound insulation effect is not good. If you leave it, you may worry about the door sinking or the floor drumming, which will cause the door to rub against the floor or the door cannot move.
2. Performing this operation firstly can effectively avoid the difficulty of placement of various special angles and sizes on the surface after the placement of the door frame. It also avoids the inconvenience of having to remove the floor notch when the individual door is installed on the floor.
3, then set the door, then, to ensure that the door frame pressed on the surface, so that in the gap between the two glass glue marked after the formation of elastic contact, both to ensure that the water will not penetrate from the break in the door frame The deformation of the door frame avoids the difficult combination of the floor and the door frame when the door is first installed and the floor is installed.
Precautions on installation
First, when to set the door
No matter what kind of material door, usually takes about 20 days before delivery, of course, the season time limit will be longer, and the delivery time of Tongmen is about 30 days, so from the beginning planning renovation will have to book the door In addition, the size of the door is not the same for each household, there is no fixed standard, so the door is only required to measure the size of the order.
Second, when to install the door
For the door ordering and placement, first of all, the quantity of the door is required. Generally, there are three types of options. The first is the amount of water that has not yet been laid on the floor after the completion of the water and electricity. The second is the completion of the floor after the completion of the water and electricity, and finally It is the completion of the hydropower floor, and after the scraping of the putty head, the door must not be moved after the door is installed by the master. Otherwise, the installation of the door will be affected.
Summary: The above is about the first installation of the floor or the contents of the first door , I believe that my friends for the first floor or first install the door already have a better understanding, of course, if you have better suggestions and ideas, please feel free to consult Xiao Bian.