Three guidelines for the use and maintenance of geothermal floor heating

Nowadays, more and more families choose to install plumbing and geothermal floor during renovation. However, due to the higher maintenance requirements of plumbing and geothermal floor, consumers must pay more attention to details when paving and using, especially in the case of central heating. One week, I have to pay special attention to the geothermal floor debugging in my home.

The first use of heating should be gradual

For the first time using geothermal heating, attention should be paid to slow heating. When used for the first time, the first three days of heating should be gradually warmed up: the first day water temperature 18 ° C, the next day 25 ° C, the third day 30 ° C, the fourth day can be raised to normal temperature, that is, water temperature 45 ° C, surface temperature 28 °C ~ 30 °C. Can not heat up too fast, too fast, the floor may be cracked and twisted due to expansion. When the geothermal heating system is activated again after a long time, it should be heated as strictly as the first time.

Avoid dryness and monitor indoor humidity

In winter, the climate is dry, and with the use of geothermal heating, the floor is prone to cracking when it is exposed to high temperatures for a long time. At this time, it is necessary for the owner to humidify the room to avoid dry deformation of the floor. When decorating, be careful not to punch holes and nails on the ground to avoid leaking the geothermal pipeline, causing the geothermal system to run water and the floor to be scrapped. Because the surface temperature of the floor is relatively high, it is better not to place the glassware and porcelain in the room directly on the ground to avoid uneven heating, which leads to the “water mountain” in the home.

The ground temperature should not be too high during use

It should be noted that with geothermal heating, the surface temperature should not exceed 28 ° C, and the water pipe temperature should not exceed 45 ° C. If this temperature is exceeded, it will affect the service life and service life of the floor. The average family, when the room temperature reaches 22 °C in winter, is already very comfortable. If the temperature rises normally, it will not affect the use of geothermal floor.

[WeChat public number " Jiuzheng floor network ", you can view the popular article "Cry a cry, you get 150 million, we are shocked!", want to exchange with peers, please join the "Jiuzheng floor network exchange group"]

Dear! Want to know the topic of this month's floor? For related content, please click: Flooring: A big deal!

High Speed Door

High speed shutter door is a rapid operating, anti-crash shutter door for indoor application . The most advantage of this door is that the opening/closing speed can reach to 0.6-1.8m/s, really fast action a lot than tranditional rollling shutter door. short opening and closing times reduce cooling loss, avoid airflow and enable a smooth operating procedure. They can also be designed in larger dimensions for the mining and aircraft industries.

High speed door can be easily installed, economical,quiet and efficient with electromechanical drive.

This door quickly though in/out open gate, ideal for warehouses,factories, hangars use, widths can be from 2m to 20 meters.

The material of this door are variety: PVC curtain to keep the insdie clean, heavy duty aluminum door with wind-resisitant function can wrok in heavy windy weather, and also the freezer door can be used in cold warehouse or somewhere like that.

Including models are:PVC High Speed Door, Aluminum Spiral High Speed Door, Self-Recovery repair door, Cold Storage Room Fast Door.

high speed door


High Speed Door,PVC High Speed Door,Aluminum High Speed Door,Spiral High Speed Door

Shenzhen Hongfa Automatic Door Co., Ltd. , https://www.hffreezerdoor.com