Linyi maps a decade of geothermal development

On March 15th, the Linyi City Government of Shandong Province issued the “Geothermal Resources Exploration, Development, and Utilization Plan (2011-2020)” to make a new evaluation of the amount of geothermal resources, the amount of recoverable resources, suitable mining areas and their conditions for development and utilization. By 2020, 11 geothermal resource-rich areas and 30 abnormal sites will be surveyed, and the utilization of geothermal resources will reach 100%.

In terms of geothermal resources exploration, the “Planning” proposed that 11 exploration sites for geothermal resource-rich regions be completed from 2011 to 2013, and 13 geothermal anomaly sites be surveyed from 2014 to 2015; from 2016 to 2020, The remaining 17 geothermal anomaly surveys were completed.

In terms of geothermal resources development, the "planning" requires that the development of tourism and holiday projects should be focused on, while supporting the development of geothermal utilization in the construction of new rural areas. From 2010 to 2013, it will focus on the development of four geothermal fields such as the geothermal field in the Beicheng New Area. From 2014 to 2015, it will focus on the development of six geothermal fields, such as the geothermal field in Mazhuang Mountain, Xuzhuang, Zhangcheng City, and the development of the Lanshan District from 2016 to 2020. Geothermal fields and other geothermal fields. By the end of 2015, 10 million yuan of geothermal development projects in Linyi City will have been achieved; by the end of 2020, the annual scale of geothermal development projects in Linyi City will reach 7.5 million, and the added value of tourism will reach 5 billion yuan; in terms of geothermal resources protection, The "Planning" emphasizes that the geothermal well wellhead protection must be strengthened to ensure normal mining and water quality stability, and the utilization of geothermal resources should be increased. By the end of 2015, geothermal resources will have a cascade utilization rate of 80% and will reach 100% by the end of 2020; Each geothermal well in the area can only mine one geothermal water in thermal reservoirs, and other thermal reservoirs are strictly shut down. Intensify the use of resources and reduce expenditure, strengthen recharge, and by the end of 2015, the recharge rate of developed geothermal fields in Linyi City will reach 50%. It will reach 90% by the end of 2020.

Pre-hung Door

Pre-hung Door,High Quality Pre-hung Door,Pre-hung Door Details, Zhejiang Jihengkang (JHK) Door Industry Co., Ltd.

JiHengKang (JHK) Door Industry Co.,LTD , http://www.zjwoodendoors.com