Recapture the first pass: There are a few ideas in the repossession process
The general procedure for repossession is:
1. The developer mails the notice of repossession to the buyer by registered letter more than ten days before the repossession, telling the time of the specific repossession and the information to be prepared.
2. Buyers should bring in the required documents and documents (including notices for repossession, copy of the owner’s ID card, original payment receipts, etc.) within the time specified on the notice for repossession (usually about 30 days). , purchase contract, etc.) to the designated unit (real estate site) for resumption of admission. If the buyer does not go through the relevant formalities within the agreed time, it is deemed that the developer has actually delivered the room to the buyer. The buyer bears all risks and taxes concerning the purchase of the house from the date of the deadline for the notice.
3, site acceptance of the building
1) The developer should first present the "Qualification Certificate for Construction Projects" and issue the "Domestic Use Instruction" and "Residential Quality Assurance Certificate" and various related acceptance forms to the households, such as the "Household Inspection List for Housing Inspection" (the function partition of the house and the subject matter List all acceptance contents, such as living room floor, balcony floor, etc.) and acceptance opinion form (such as "Building Acceptance Record Form");
2) The buyer pays a copy of the ID card, notice of repossession, receives the key of the house, and is led by the receptionist of the company to check the status of the building according to the agreed standards of the two parties agreed upon by the purchaser.
3) According to the original contract inspection standards;
4) After checking the completion of the building, the buyer fills in the "Household Inspection Form for Handover of Home Inspection" according to the actual acceptance, and copies the bottom of the water meter and the meter in the specified form (generally attached to the "List of Handover Rooms"); if there is any dissatisfaction, Can submit comments and fill in the "Building Acceptance Record" as a written basis, if the developer does not prepare the form, the buyer should send the comments in writing to the developer.
5) According to the buyer's opinion, the buyer and the seller negotiate a solution. If it can be rectified, negotiate and sign the relevant rectification and maintenance documents, and agree that the next inspection time should not exceed 30 days;
6) If you are basically satisfied with the building, you should sign and approve it on the "Household Inspection Form for Housing Transfer".
4, check in
1) Change invoices and pay related expenses;
2) Fill in forms such as "Household Profile Form", "Check-in Agreement", "Fire Responsibility Form";
3) Receive a variety of check-in manuals and handouts such as the "household handbook" and "service guide".
Handover Notices Inspection Room Del Flooring House Residential Window Room House Remodeling House Renovation Model Room Model House Design Toilet Model Room Tile Model Room Living Room Renovation Model Room Renovation Model Room Renovation Living Room Glass Tile Technology Glass Glass Door Floor Tile Kitchen Cabinet Door Floor Tile Glass Door Cabinet Door Kitchen Glass Sliding Doors Bathroom Tiles Bathroom Doors Bathroom Waterproof Price Overall Bathroom Toilet Design Toilet Waterproof Bathroom Floor Tiles Bathroom Leakage Tiles Specification Tile Prices Kitchen Tiles Balcony Tiles ld Tiles Floor Tiles
Tape Measure is a commonly used tool in daily life. What you often see is the Steel Tape Measure, which is commonly used in construction and decoration, and is also one of the essential tools for the family. Divided into fiber tape measure, tape measure, waist measurement and so on. Luban ruler, Feng Shui ruler, and Wen Gong ruler are also steel tape measures.
Inch Tape Measure,Tape Ruler Measurements,Tape Measure Inches,Imperial Tape Measure
Shangqiu Yusheng Tools co.,Ltd. , https://www.cnystools.com