Composite floor installation method How to prevent moisture in the composite floor

With the continuous progress of society, people pay special attention to home decoration. Composite floor is widely used in modern home decoration. Composite floor is formed by staggered pressing of different tree species and different plates. It overcomes the one-way performance of solid wood flooring. Same-sex and other shortcomings, its low shrinkage and swell rate, and good stability, while still retaining the natural wood grain and comfortable touch on the surface of solid wood flooring. Then, the following Xiao Bian will introduce to you the composite floor installation method and how the laminate flooring is protected against moisture.

First, composite floor installation method

1. Preliminary preparations: The seller is required to send someone to check the laying conditions of the site. If it does not meet the laying requirements, refer to the professional advice of the technicians and arrange for equal treatment as soon as possible. Measure the paved area, determine the laying direction and the number and types of accessories; Determine the laying method: ordinary suspension, geothermal suspension, luxury keel type.

2, 2-3 days before installation, agree with the sales party accurate installation time. The premise is to ensure that the ground is dry, flat, clean, and does not cross construction.

3, the cable, telephone line, network cable layout.

4. If the wall heating pipe trough is too large or too deep, it is best to fill it with dry sand and do not seal it with cement.

5, if there is a water pipe or heating pipe transformation, be sure to inform the installation master in advance, so as to avoid unnecessary trouble.

6, sprinkle a good floor medicine, especially the corners and the door to sprinkle more.

7. Ask the installation master to remove the bottom cover and allow the floor to be inserted under the door so that the floor is more solid.

8, paved moisture mat, if it is geothermal ground, must use special geothermal mat.

9, before the installation is best to open the box, check the floor surface there is no missing corners (this is rare, but also to prevent).

10. Make sure that the floor and the wall maintain an 8mm retractable space.

11. Make sure that each room has its own plate (disconnected at the door, leaving a telescopic space). If it is a large area, disconnect every 8-10 meters.

12, when installing the kick line, it is best to use the yin and yang angle, because the use of the yin and yang angle, kick corner joints will be strong.

13, the floor and the kitchen floor tile connection, it is best to use copper or stainless steel bar, do not use ordinary plastic bar.

Second, how to prevent moisture composite floor

1, paving mats. Ground mats require floor mats with a thickness of 2.5 mm or more, and floor heating mats cannot use composite floor mats. The joints of each floor mat must be connected with a wide tape, and there must be a 2-3 cm return at the edge of the wall.

2, put the board. If it is winter, the floor must be accommodated in the room for a while and don't open it for the time being.

3, floor paving start and end must be left expansion joints 1-1.2 cm.

Composite floor moisture-proof Note: One is placed under the damp-proof cushion, and then the home is to put some things that can absorb moisture, such as wood-carbon. Also pay attention when cleaning regularly, don't get too much water. In fact, if you just sweep, with a semi-moist mop, the floor will generally not be a problem.

Editor's summary: The method of installing the laminate flooring and how the laminate flooring is protected against moisture are introduced here. We hope to help everyone. If you want to know more related information, you can pay attention to this website information.

Floor mounting floor

Mini Drill

Mini Drill,Mini Impact Drill,Electric Drill,Electric Drill 450W

AWLOP CO.,LTD , https://www.awlop.com